MIA Runway - Malta
Design, analysis and implementation stages for resurfacing main runway
Specialist consultancy to Malta International Airport plc during the design, analysis and implementation stages for the resurfacing of the main runway (Runway 13-31), along a total length of circa 3.350km was provided. The project entailed the scarification and reinstatement of 50mm thickness of the existing asphalt along 15-metre central width (keel section) of the runway (7.5m on either side of the centreline), whilst a 60mm thick intervention on a width of 30-metres was carried out on the touch-down area (on Threshold 31).
Appointment: 2007; Construction start: 2007; Completion: 2008; Area: 3.5km; Client: Malta International Airport plc.
MIA Runway - Malta
Description
Design, analysis and implementation stages for resurfacing main runway
Involvement
Specialist consultancy to Malta International Airport plc during the design, analysis and implementation stages for the resurfacing of the main runway (Runway 13-31), along a total length of circa 3.350km was provided. The project entailed the scarification and reinstatement of 50mm thickness of the existing asphalt along 15-metre central width (keel section) of the runway (7.5m on either side of the centreline), whilst a 60mm thick intervention on a width of 30-metres was carried out on the touch-down area (on Threshold 31).
Facts & Figures
Appointment: 2007; Construction start: 2007; Completion: 2008; Area: 3.5km; Client: Malta International Airport plc.